Repair or replace: the report your board asks for

Put an old school beside a new one and see, in dollars, why the old one costs what it does. Then see which pieces of equipment are now cheaper to replace than to keep fixing, and what replacing them saves each year.

It’s built into Web Work Orders, free like everything else, and it runs on the repair history your district already has. Every repair the earlier version recorded on a piece of equipment counts, so the verdicts are there the day you point it at your database.

An old school beside a new one

Pick any two campuses or buildings, or let the page pick your oldest and newest. Each gets four gauges scored against your own targets.

Repair or replace report comparing Brookside Elementary, built 1968, with Maple Lane Elementary, built 2023, on four gauges
Brookside Elementary (1968) against Maple Lane Elementary (2023) in the Pine Valley Schools demo.
  • Repairs against what the equipment is worthA year of repairs on a building’s equipment as a share of what that equipment would cost to replace.
  • Maintenance cost per square footThe fairest way to compare buildings of different sizes, and the number boards understand fastest.
  • Equipment past its expected lifeThe share of a building’s equipment that’s older than it was meant to be. That’s where emergencies come from.
  • Emergency shareHow many of its work orders were emergencies. It falls as preventive maintenance takes hold.

Below the gauges: work orders, what was spent on labor, parts, contractors and stock, cost per occupant, the equipment and what it’s worth, and what’s worth replacing now.

Equipment: keep, watch or replace

Every asset with its age against its expected life, what a new one costs, what it cost to repair this year and over its life, how many years of today’s repair spending would pay for a new one, and a verdict in a word with the reason in a sentence.

Equipment table with verdicts: the boiler and two rooftop units marked Replace, with payback years and yearly savings
The summary line adds up everything marked Replace: what it costs to buy, what it costs to keep, and what replacing it saves.
  • Your rulesThe district decides when a repair stops making sense: the payback that means replace, the payback that means watch, and the share of a new unit’s price a year’s repairs may reach. Built in: replace within a five-year payback or at half the price of a new one; watch within ten years or a quarter.
  • Honest arithmeticRepairs are every cost line on the equipment’s work orders and nothing else. A new unit’s yearly cost is its price spread over its expected life. The saving is one less the other, and the page says what it assumes.
  • Spent each monthBoth places on one chart, so a bad winter or a summer project shows for what it is.
  • Every building in one tableYear built and renovated, square feet, work orders, emergencies, spending, cost per square foot, equipment past its life and repairs against value. A campus holds its buildings and a building its rooms, so the figures roll up the way your district is organized.
  • Print it or export itA printable page for the finance committee, and every figure in a spreadsheet.

The capital plan: next year’s board meeting, this year

The same equipment records become a replacement forecast. Every asset lands in the year its expected life ends, priced at today’s replacement cost raised for inflation, with what is already past its life as the deferred backlog, due now. In the demo, $214,800 is due now, all of it at the 1968 elementary; the next ten years add up to $534,613, about $53,000 a year.

Capital plan with replacement cost by year, stacked by school
Replacement cost by year, stacked by school, with the deferred backlog first.
  • Due now, then year by yearTiles for the backlog, the next five years, the horizon total and the steady yearly budget that would keep up.
  • School by school, item by itemThe plan for one school or the whole district, with every asset and the reason it lands where it does.
  • What can’t be planned yetAssets missing a life, a date or a cost, each a link to fill it in.

Money you can get back, and money leaking out

  • The warranty finderRepairs the district paid for while the equipment was still under warranty, parts and labor apart, on this page and on the district pulse.
  • Utility bills that jumpedAny month 25% and $150 above the same month a year earlier on the same meter. A water bill that doubles is a leak; an electric bill up in a mild month is a control stuck on.
List of repairs paid for while the equipment was under warranty
Paid for under warranty: a $2,900 compressor on a two-year-old unit.

How it saves money: seven examples from the demo

Pine Valley Schools is our made-up demo district, so you can check every number below yourself. Figures move a little from day to day because the demo’s dates move with the calendar.

  1. The boiler that costs more to keep than to replace. Brookside’s 1994 boiler had seven work orders in twelve months: $13,965 in labor and parts, 21% of the $68,000 a new one costs. A new boiler spread over its 25-year life costs $2,720 a year. Replacing it saves about $11,245 a year and pays for itself in under five years.
  2. The old school against the new one. Brookside (1968, 61,000 sq ft) cost about $69,000 in work orders over twelve months, $1.13 a square foot, with 36% of its work orders emergencies and all of its major equipment past its expected life. Maple Lane (2023, 68,000 sq ft) cost about $6,300, nine cents a square foot, with no emergencies.
  3. Three items, $19,590 a year. At Brookside, three pieces of equipment marked Replace would cost $102,000 to buy, cost $24,577 a year to keep running today, and save about $19,590 a year once replaced. That’s the sentence a facilities director takes to the finance committee.
  4. Planned work instead of breakdowns. The district pulse scores how much of your labor is planned against breakdowns, and how much preventive maintenance is done on time. Every filter change that happens on schedule is a compressor that doesn’t fail in August.
  5. The $2,900 that was never claimed. A compressor failed on a two-year-old rooftop unit with a five-year warranty, and the district paid for it. The warranty finder lists every repair charged while a warranty was running, so the claim goes in before the invoice is forgotten.
  6. The leak the water bill found. The 1968 school’s water bill went up 146% two months running. The utilities page flagged it against the same months a year earlier the day the bill was entered.
  7. Stock on a shelf is money on a shelf. The executive page shows the value of items that haven’t moved in a year, and the stock flags stop the over-ordering that fills a warehouse with filters for units replaced two summers ago.
Bar chart of monthly spending at Brookside Elementary against Maple Lane Elementary over twelve months
Spent each month: the 1968 school and the 2023 school on one chart.

What it needs from you

  • Repairs on the equipment. Work orders that name the asset, with labor and parts on them. If your earlier system recorded them, they count.
  • What a new one costs, and how long it should last. The replacement cost and expected life on each asset. Where none is recorded, the page says so instead of guessing.
  • A little about each building. Year built, last renovation, square feet and replacement value, under Admin › Locations.